Seabank CCGT Power Station (for Kier Hochtief jv), Avonmouth, Bristol.

Installing GRP pressure pipe-work of 400-500 mm to 1600mm & 2400 mm diameter with substantial reinforced concrete structures at depths ranging between 4.0 and 9.5 meters within very poor ground conditions.

Sorry, your browser doesn't support Java(tm).

MOD-BVD (for Costain Civil Engineering Ltd)
Aschurch near Tewkesbury, Gloucestershire.

Installing a new drainage system in an operational military establishment with some 2375 lineal meters of pipe-work, 225mm to 1800 mm diameter and numerous pre-cast concrete manholes, large capacity interceptors and substantial in-situ R.C. chambers.

Tesco Stores (for Birse Construction Ltd), Fenny Lock, Milton Keynes.

Foul and surface water sewer diversions. Having some 1575 lineal meters of 450 mm, 900 mm and 1500 mm diameter pipes and 18 No pre-cast concrete manholes constructed at depths from 3.5 to 9 meters within a twelve week contract period.

Sorry, your browser doesn't support Java(tm).

Motorola (for Birse Construction Ltd), Swindon.

Main drainage infrastructure with some 2900 lineal meters of 1500mm to 750mm diameter pipe-work and 89 No pre-cast concrete manholes being constructed within 10 weeks.

For further information please contact:

Dragtone Ltd
Browning Way, Woodford Park Industrial Estate, Winsford, Cheshire, United Kingdom, CW7 2JR.

Phone +44(0)1606 861978 | Fax +44(0)1606 861159
E-Mail info@dragtone.co.uk

www.dragtone.co.uk

Click to Return to Top | Powered by Infotex UK